SWC carried out the waterproofing to the new roofs and temporary waterproofing to the 2nd floor on this existing building in West London for IDM Developments London. We installed approximately 4000m2 of  REPOMA spray applied roofing membrane and was tasked to remove all existing slabs, insulation and reinstating laid to falls insulation before  spraying the REPOMA system. 

SWC installed the waterproofing to the podium deck area at One The Square in Cambridge for Wates construction. The Wates management team thanked us for our work on this project and would happily give us references and take us on to there next project if any waterproofing is required. This is one of many projects we have been tasked to either waterproof the podium deck or roofs.

SWC carried out approximately 6000m2 of cavity drain membrane to the renovated King Edward V11 Hospital in Midhurst for City And Country.

SWC carried out Type C waterproofing on this 6 level basement. SWC designed and installed the cavity drain membrane as well as installing the external waterproofing to the capping beam and deck areas using a variety of manufacturers material.

SWC carried out the external waterproofing on the new Google Building basement in Kings Cross.

SWC carried out the waterproofing on this large project in North London  installing several different RIW waterproofing material to the new basement construction. We worked directly for both Galldris and Vinci on this project. We installed RIW Structureseal to the Piled walls and under the RC slab.  We installed RIW Gas membrane to the upper ground floor areas as well as installing RIW Toughseal, Flexiseal Pro, Cementseal, Sealing Compound, LAC to various different areas. This project has had approximately 10,000m2 of waterproofing installed.

SWC have carried the below ground type C waterproofing on this new Hotel in Aldgate, London

SWC supplied and installed various RIW waterproofing materials to this complex site in Kings Cross. As a refurbishment project and being situated next to the river there was many complex details to overcome but working with the client we managed to get the project complete on time and on budget.

Structural Waterproofing Contracts Ltd carried out all the below ground waterproofing to the new Crossrail project at New Bond Street in London for Costains and Skanska. We installed Grace Construction Products Preprufe to the full envelope of the basement. SWC also installed all Grace water bar to all the construction joints as well as installing Grace Servirufe Traffic Deck system to the podium. As a Grace approved installer we can offer a manufacturers guarantee along with our own. For contact details for a reference please contact our office.