IDM Developments, London, Hoover Building
SWC carried out the waterproofing to the new roofs and temporary waterproofing to the 2nd floor on this existing building in West London for IDM Developments London. We installed approximately 4000m2 of REPOMA spray applied roofing membrane and was tasked to remove all existing slabs, insulation and reinstating laid to falls insulation before spraying the REPOMA system.