Multiplex, 73-89 Oxford Street
We carried out work at 73-89 Oxford Street in London for Brookfield Multiplex. We installed 3000m2 of RIW Cavity Drain Membrane to B1 and B2 basement. We was asked to help with the design of the waterproofing and take full design responsibility. We issued detail drawings in CAD and have all the appropriate insurances to meet the needs of the client on this project.